Commercial estimating for builders

Send us the drawings for a fit-out, a multi-unit job or a health project, and we send back every trade measured and priced in an Excel BOQ, with marked-up PDF plans. For a tender, the RFI list, the exclusions list, the returnables checklist and the missing documents list come with it.

The jobs we price

  • Fit-outs

    Partitions, ceilings, joinery, finishes and the services behind them.

  • Multi-unit

    Every trade across every unit, so the totals add up to the whole job.

  • Health

    Health units priced across all trades, the way the NSW Health job below was.

Steel frame being erected on a building site
Bring the shell, fit-out, building services and tender requirements together.

What you send

The drawings and any tender documents, the job location and your deadline. Still gathering information? Start with what you have. Have your own supplier or subcontractor rates? Send those too.

What you get back

  • Priced bill of quantities. Quantities, rates and totals in an editable Excel workbook.
  • Marked-up plans. Follow each measured quantity back to the drawing.
  • Exclusions & RFIs. See what sits outside the price and what needs an answer.
  • Tender registers. Track returnables and missing documents for tender scopes.

Lifts, facades and other specialist work we carry as provisional sums, and the exclusions list says so.

What it costs

One fixed fee, agreed before we start. The NSW Health units are an actual past project fee. All fees are ex GST.

Job Fee, ex GST What you get back
20 senior health units, NSW Health $1,100 Every trade across all 20 units. Excel BOQ, marked-up plans and the RFI list.
Large commercial fit-out $2,000+ The same files, plus the returnables checklist and missing documents list for the tender.

Questions about commercial estimating

Who does the work?
Our estimators are based in the Philippines. Engineers in Australia lead the team and check every estimate before it goes to you.
How long does an estimate take?
Most jobs are delivered within two working days after your go-ahead. Larger or more complex projects can take longer. Your delivery date is confirmed with your fixed fee.
What is outside the estimating scope?
Site visits and measures, design or engineering sign-off, bank valuations, depreciation schedules, progress claims and legal or contract advice. Specialist works may be carried as provisional sums.
Are my plans confidential?
Yes. Constructline can sign your NDA or its own, and does not price two competing builders on the same job.