If you are a builder or subcontractor pricing a job to win it, you need an estimator. If you need a bank valuation, a depreciation schedule or a progress claim, you need a quantity surveyor.
Both measure plans and both work with costs, which is why the two get mixed up. This guide covers what each one does, how they compare side by side, when a builder needs a quantity surveyor, and which one Constructline is.
What does a construction estimator do?
An estimator works out what a job will cost to build, so you can put a price in. They measure every item on the plans, put a rate against each one for labour, materials and plant, and add it up trade by trade. What you get back is a priced bill of quantities you can add your margin to.
A good estimator also tells you what is missing. Anything the drawings do not show goes on an RFI list as a question, and anything left out of the price goes on an exclusions list, so you know what your number covers before it goes to the client.
What does a quantity surveyor do?
A quantity surveyor looks after the cost of a building across its whole life, and often for someone other than the builder. A bank may want one to value the work before it lends. An owner may want one to check a builder's price or to certify what has been built before a payment goes out. An investor may want a depreciation schedule for tax.
Quantity surveyors can measure and price plans too, and some builders use one for it. But much of the work is reporting and certifying, and that is work an estimator does not do.
How do they compare side by side?
| Estimator | Quantity surveyor | |
|---|---|---|
| Who they usually work for | The builder or subcontractor putting in a price | The client, the bank, the owner or the builder |
| The question they answer | What will this job cost me to build? | What is this work worth, and what has been spent? |
| What you get back | A priced BOQ, marked-up plans, exclusions and RFIs | A cost plan, report, valuation or schedule, depending on the job |
| When you call them | Before you tender or quote | Before finance, during the build, or after it |
| How the fee is set | Our fee is fixed per job, from $200 ex GST | Quoted per job, and usually higher than ours |
The short version: an estimator works for the person putting in the price. A quantity surveyor often works for the person paying it, or lending against it.
When does a builder need a quantity surveyor?
Usually when someone else asks for one. These are the common cases:
- The bank lending on the job wants a valuation or a cost report before it releases money.
- A progress claim has to be assessed or certified by someone independent of you.
- An owner or investor wants a depreciation schedule for the finished building.
- A dispute over variations or the value of work done needs a cost expert.
Whether you need one, and who pays for it, often comes down to the contract or the lender. Check your contract and ask the bank before you assume.
Can an estimator write a bill of quantities?
Yes. A bill of quantities is every item on the plans, measured, set out trade by trade. An estimator writes one for every job they price, because it is how the price is built. The difference is who it is written for. Ours is written for the builder: an editable Excel workbook with rates and totals beside each line, and marked-up plans that show where each quantity came from. See what is in a priced bill of quantities for a real page from one, or what a quantity take-off is for the measuring step under it.
What does each one cost?
A quantity surveyor's fee is usually higher than ours, and it is quoted per job. Our fee for an estimate starts at $200, ex GST, and is fixed before we start. A few of the fees we have charged:
- Granny flat, renovation, extension or shed$200 to $400
- All trades, $2.5M house$2,000
- 20 senior health units, NSW Health$1,100
The full table, and how the fee is worked out, is in what a construction estimate costs.
Which one is Constructline?
We are an estimating service. We measure and price builders' and subcontractors' plans so they can tender and quote. Our estimators are based in the Philippines. Engineers in Australia lead the team and check every estimate before it goes to you.
We do not do bank valuations, depreciation schedules or progress claims, and we do not give legal or contract advice. If you need any of those, speak to a quantity surveyor. If you need a price for a job, we can help, and if you are weighing us up against hiring your own estimator, read outsourced estimating vs an in-house estimator.
A Sydney builder went from one trial job to six priced tenders and won Cabramatta West. Read the Newbuild Developments case study, or find more answers in our guides.
Get a price for your job