How long does a construction estimate take?

Updated 13 November 2026

Most of our estimates are delivered within two working days after your go-ahead. Larger or more complex projects can take longer, and your delivery date is confirmed with your fixed fee, so you know before you say yes whether it lands before your tender closes.

This guide covers how much work sits behind an estimate, what slows one down, what you can do to get it back sooner, and what happens when the drawings change after you have sent them.

What happens between sending plans and getting the estimate?

Four steps, and the clock for delivery starts at the second one, when you give us the go-ahead:

  1. Start with a conversation. And a set of plans. Send your drawings and tender documents, plus the location and the date you need the estimate. Still gathering information? Start with what you have.
  2. The scope. The fee. The delivery date. We review the documents and agree one fixed fee. You can ask questions and confirm the scope before giving us the go-ahead.
  3. Technology measures. Experience checks. AI assists the takeoff. Estimators apply the rates and resolve the detail. Australian engineers check the estimate before it reaches you.
  4. The detail you need. Ready for your quote. Your Excel costs, marked-up drawings and scope notes arrive by email and in your client login. Add your margins and prepare your quote.

The first two steps are where you can save the most time. A full set of documents and a clear date mean the fee and the delivery date can be agreed quickly, and the estimator can start measuring straight away.

How many hours of work go into an estimate?

More than most builders expect. We allow about 0.25 of an hour for each square metre of floor area, so a 100 m² house is about 25 hours of estimating. That is a person measuring your drawings and pricing what they measure, then an engineer checking it.

Hours of work and days until delivery are two different numbers. The hours set the fee. The delivery date is the one we confirm with you before you say yes, and it is the one you plan your tender around. See what a construction estimate costs for how the hours turn into a fee.

What slows an estimate down?

These are the things that push a delivery date out:

Missing drawings No structural set, no specification or no schedules means more questions before the price is firm.
More trades Every trade you add is more to measure and price. One trade comes back sooner than a whole job.
Drawings that change mid-way A new revision part way through means measuring parts of the job again.
Tender documents A tender that needs returnables, schedules and registers adds lists on top of the BOQ.
Size The bigger the floor area, the more hours of measuring and pricing.

None of these stop the estimate. When a drawing is missing a detail, we do not guess quietly. The gap goes on the RFI list as a question, or into the BOQ as a stated assumption you can see and change.

How do you get an estimate back sooner?

  • Send the full set in the first email: architectural and structural drawings, the specification and any schedules.
  • Tell us the job location and the date you need it, so the delivery date is set around your tender.
  • Say which trades you want priced. One trade, a few, or the whole job.
  • Send your own supplier or subcontractor rates with the drawings if you want them used.
  • Answer questions on the scope before you give the go-ahead, not after.

Still gathering information? Start with what you have. The scope and the date can be agreed on what is there, and the rest can follow.

What if the drawings change after you send them?

Send the addendum through. The team reprices the changes and reissues the files at no extra cost. If the overall scope changes, any fee change is agreed with you before we go on, and so is any change to the delivery date. Check your contract for how long you have to price a tender addendum, and tell us that date when you send it.

How many tenders can you get priced in a month?

Each job gets its own fixed fee and its own delivery date, agreed before you say yes, so you can plan a run of tenders one date at a time. A Gold Coast painting contractor had 13 tenders priced in four months, $233 each on average. Read how Rusty's Painting used us, or see all our case studies.

What arrives at the end?

Your Excel BOQ, marked-up plans and scope notes, by email and in your client login. See what is in a priced bill of quantities for a real page from one. If you are deciding whether to keep doing this in-house, read outsourced estimating vs an in-house estimator. More answers are in our guides.