Skip to content
Constructline
Pricing

What a construction estimate costs

Updated 13 November 2026

Our fee for an estimate starts at $200, ex GST. A granny flat, renovation, extension or shed is $200 to $400, and every trade on a $2.5M house was $2,000. You see the fixed fee before an estimator opens your plans.

This guide shows the fees we have charged on real jobs, what changes the fee, what you get back for it, what sits outside it, and how to get a price for your own plans. Every fee on this page is a real one we have published.

How much does a construction estimate cost?

These are jobs we have priced and what we charged for them. All fees are ex GST, and every one of them includes our rates, not quantities on their own.

Job Fee, ex GST What you get back
Granny flat, renovation, extension or shed $200 to $400 All 19 trades measured and priced. Excel BOQ and marked-up plans, back in about 2 working days.
All trades, $2.5M house $2,000 Excel BOQ, marked-up plans, the exclusions list and the RFI list.
20 senior health units, NSW Health $1,100 Every trade across all 20 units. Excel BOQ, marked-up plans and the RFI list.
Large commercial fit-out $2,000+ The same files, plus the returnables checklist and missing documents list for the tender.
Cleaning estimate, Sydney Metro station $700 / station One station per fee. Quantities and rates in Excel for that station.

Read down the table and the pattern is plain. A small home job is a few hundred dollars. A large house with every trade, the exclusions list and the RFI list is a couple of thousand. A tender for a large commercial fit-out starts at the same figure and adds the lists a tender asks for. Some work is priced by the unit: a cleaning estimate for a Sydney Metro station is one fee per station.

The fee follows the hours it takes to measure and price your drawings, not the value of the build. That is why the 20 senior health units for NSW Health, every trade across all 20 units, came in under the $2.5M house.

What changes the fee for an estimate?

Three things move the fee: how big the job is, how many trades you want priced, and how complete your drawings are.

The size of the job

The fee is worked out from estimator hours. That hour is a person measuring your drawings and pricing what they measure. We allow about 0.25 of an hour for each square metre of floor area, add the hours up, and that is the fixed fee you get back.

A 100 m² house is about 25 hours of estimating.

The trades you want priced

You can ask for one trade, a few trades or the whole job. We price 19 trades, from preliminaries and demolition through to services and external works. A subcontractor who only needs painting or tiling priced pays for that trade. A builder who wants every trade on one BOQ pays for every trade. Your estimator confirms the final inclusions with you before the fee is set.

How complete your drawings are

We price what the plans show. When a drawing is missing a detail, we do not guess quietly. The gap goes on the RFI list as a question, or into the BOQ as a stated assumption you can see and change. Send the full set you have, with the structural drawings, the specification and any schedules, and the estimate needs fewer of those. Still gathering information? Start with what you have.

What do you get for the fee?

The same files come with every estimate, sized to the job:

  • Priced bill of quantities. Quantities, rates and totals in an editable Excel workbook.
  • Marked-up plans. Follow each measured quantity back to the drawing.
  • Exclusions & RFIs. See what sits outside the price and what needs an answer.
  • Tender registers. Track returnables and missing documents for tender scopes.

The BOQ is an Excel workbook you can open, edit and add your margin to. The marked-up plans are PDFs, so you can check any quantity against the drawing it came off. See what is in a priced bill of quantities for a real page from one.

Wrong quantity? We fix it free. Addenda repriced at no extra cost. If the drawings change, send the addendum through and the team reprices the changes and reissues the files. If the overall scope changes, any fee change is agreed with you before we go on.

What does a quantity surveyor charge?

A quantity surveyor's fee is usually higher than ours, and it is quoted per job. If you need a bank valuation, a depreciation schedule or a progress claim, that is not our work, so speak to a quantity surveyor.

What we do is the work a builder or subcontractor needs to put a price in: every item measured, every item priced, and the files to check it. Our estimators are based in the Philippines. Engineers in Australia lead the team and check every estimate before it goes to you.

What is not included in an estimate?

The fee covers estimating from your documents. It does not cover:

  • Site visits or site measures
  • Design or engineering sign-off
  • Lifts, facades and other specialist work, which we carry as provisional sums
  • Bank valuations, depreciation schedules or progress claims
  • Legal or contract advice

Anything we leave out of the price is written on the exclusions list, so nothing is left out without you knowing.

How long does an estimate take?

Most jobs are delivered within two working days after your go-ahead. Larger or more complex projects can take longer. Your delivery date is confirmed with your fixed fee, so you know before you say yes whether it lands before your tender closes.

The files arrive by email and in your client login. Add your margins and prepare your quote.

What does estimating cost over a run of tenders?

A Gold Coast painting contractor had 13 tenders priced in four months, $233 each on average. That was 13 tenders for $3,025, including GST. Read how Rusty's Painting used us.

A Sydney builder went from one trial job to six priced tenders and won Cabramatta West. Read the Newbuild Developments case study, or see all our case studies.

Does the fee ever change?

Only if your scope does. No subscription, no lock-in. You pay a fixed fee per job, agreed before the work starts.

How do you get a quote for an estimate?

  1. Send your drawings and tender documents, plus the location and the date you need the estimate.
  2. We review the documents and agree one fixed fee and a delivery date. You can ask questions and confirm the scope before giving us the go-ahead.
  3. Your estimator measures and prices the job, and an engineer checks it.
  4. Your Excel BOQ, marked-up plans and scope notes arrive, ready for your quote.

More answers are in our guides.

Get a price for your job