Can your estimate use your own supplier rates?

Updated 13 November 2026

Yes. Send your preferred supplier and subcontractor rates with the plans, and the estimator prices the measured quantities at your rates instead of their own. Where your rates stop, the estimator prices the rest and clarifies any allowances with you before the estimate is final.

The take-off is the same either way: the quantities come off the plans. What changes is the rate each quantity is multiplied by. This guide covers why your own rates help, which ones to send, what makes a rate usable, and how to keep them current.

Why use your own rates?

Because they are what the job will really cost you. A builder with a good timber yard account, or a subbie they have used for years, often pays a different price from a market rate. An estimate at your rates is a price you can build to, and it makes it easier to see where your margin really sits.

It also saves you a step. Without your rates, you would take the estimate and change the lines yourself before quoting. With them, the estimate arrives already priced the way you buy.

Which rates should you send?

Send whatever you have for the trades in your scope. Most builders have some of these:

Rate What it covers Say with it
Supplier price lists Materials you buy often: timber, concrete, plasterboard, tiles The unit, whether delivery is in, and the date the prices hold to
Subbie quotes A whole trade or part of one, like the electrical or the roof What the quote includes and excludes, and the plans it was priced on
Labour rates Your own crews, per hour or per unit of work Whether the rate is the wage alone or includes on costs
Plant and hire Excavators, scaffold, bins, cranes Per day or per week, and any minimum hire or delivery charge

A spreadsheet, a price list from your supplier or a stack of past quotes all work. It does not need to be tidy. It needs to be clear which price goes with which item.

What makes a rate usable?

A rate is only useful if it can be matched to a measured quantity. Check these before you send them:

  • The unit matches how the item is measured: per square metre, per lineal metre, per item.
  • It says whether GST is in or out, and whether delivery is included.
  • It says whether it is supply only, or supply and install.
  • It is recent, or you know it still holds.

Subbie quotes need one more check. A quote is priced on a set of plans and a scope, so make sure it was priced on the same revision you are tendering, and read what it leaves out. Anything the subbie excluded still has to be priced by someone, or it is missing from your total.

Watch the supply only rates most. A price per sheet of plasterboard is not the cost of a wall. Labour, fixings and waste still have to go on top, and they go missing when a rate is read as the whole cost.

What happens to items your rates do not cover?

Every job has some. The estimator prices them from their own rates for labour, materials and plant in your state, and any allowances they had to make are clarified with you before the estimate is final. Ask which lines use your rates and which do not, so you know which numbers to check against your own suppliers.

Is a supplier rate the same as a schedule of rates?

No. Your supplier rates are what you pay. A schedule of rates is a list of unit prices you give a client, usually with no quantities and no total. BOQ vs schedule of rates explains the difference, and how to price a tender shows where your rates fit in a full price.

How do you keep your rates current?

Send the rates you have with each job, rather than once. Prices move, and an old price list in a new estimate is a common reason a job loses money. Your priced bill of quantities comes in Excel, so you can also change any rate yourself when a supplier comes back with a new price. See what is in a priced bill of quantities for a real page from one.

Do we price at your rates?

Yes. Share your preferred supplier or subcontractor rates with the drawings, and we use them. If you are a subbie pricing your own trade, the same works for one trade at a time. A Gold Coast painting contractor had 13 tenders priced in four months, $233 each on average. Read the Rusty's Painting case study. Our fee is fixed per job, and a few of the fees we have charged are below.

  • Granny flat, renovation, extension or shed$200 to $400
  • All trades, $2.5M house$2,000
  • 20 senior health units, NSW Health$1,100