Skip to content
Constructline
Guide

Estimating glossary: the words in an estimate, a BOQ and a tender

Updated 13 November 2026

This glossary explains the words builders, estimators and quantity surveyors use in estimates, BOQs and tenders, in plain terms. Each word has its own link, so you can send someone straight to the one they asked about.

The terms are in alphabetical order. Where a word has a full guide of its own, the links at the bottom will take you there.

Addendum
A change to the drawings or tender documents issued after the first set. Every addendum has to be priced, because it can replace a sheet that was already measured. More than one are addenda.
Allowance
A sum put in an estimate for something that cannot be measured exactly yet. Provisional sums and PC items are both allowances.
Assumption
Something the estimator had to decide because the documents did not say, written down so you know which numbers could move.
Bill of quantities (BOQ)
A list of every item in the job, each with its quantity and unit. A priced BOQ adds a rate and a total to each line, grouped by trade.
Clarification
A note in a tender that says how something was priced where the documents were unclear, so the client knows what the price assumes.
Contingency
A sum held for risk: things that may go wrong or turn up that nobody can name yet. It is different from a provisional sum, which is for a known item.
Cost plan
An estimate prepared early, often from concept drawings, to check a design against a budget before it is finished.
Drawing register
A list of every drawing in a set with its current revision. It is the quickest way to check you are pricing the latest plans.
Estimate
A worked out cost of building a job from its plans, before the work starts. A builder adds margin to an estimate to make a quote or a tender price.
Estimator
The person who measures the plans and prices the work. On a builder's side, the estimator works out what the job will cost to build.
Exclusions
Items a tender or estimate says it does not cover, so nobody can assume they are in the price.
Fixed fee
A price for a piece of work agreed before it starts. Our estimating fee is fixed per job: granny flat, renovation, extension or shed estimates have cost $200 to $400.
GST
The goods and services tax. Rates and quotes should always say whether they are ex GST or include it.
Inclusions
The items a price does cover, listed so the client can compare like with like across tenders.
Lump sum
One price for the whole of the work described, rather than a price per unit. Most tenders ask for a lump sum.
Margin
What a builder adds on top of the cost of the job for profit. It is kept separate from overhead and preliminaries so you can see each one.
Marked-up plans
Drawings coloured or annotated to show what was measured, so each quantity can be traced back to the drawing. Ours come as PDFs.
Measured work
The parts of the job that can be measured off the plans and priced by quantity and rate, as against allowances and preliminaries.
Overhead
The cost of running your business, like the office, vehicles and admin, spread across every job rather than charged to one site.
PC item (prime cost item)
An allowance for an item that has not been chosen yet, like tapware or an oven. The supply cost is adjusted to the real price once it is chosen.
Plant
Machinery and equipment used to build the job, like excavators, cranes, hoists and scaffold, whether owned or hired.
Preliminaries
The cost of running the site rather than building any one part: site setup, supervision, amenities, access and cleaning. Often called prelims.
Program
The construction schedule: what happens when, and how long the job takes. Time related preliminaries are priced from it.
Provisional sum
An allowance for work that cannot be priced yet because it is not designed or the extent is unknown, adjusted once the work is known.
Quantity
How much of an item the job needs, in its unit: square metres of slab, lineal metres of skirting, a count of doors.
Quantity surveyor (QS)
A professional who measures and manages construction costs, often for the client, across the life of a project as well as at tender.
Quote
The price you give a client for the job, built from the estimate plus your margin and any conditions.
Rate
The price for one unit of an item, like a cost per square metre of tiling. A quantity times its rate gives the line total.
Returnables
The forms and schedules a tender asks you to fill in and send back with your price, like the tender form, a pricing schedule or proof of insurance.
Revision
A numbered or lettered version of a drawing, shown in the title block. A new revision replaces the old one and may change quantities.
RFI (request for information)
A question sent to the client or designer when the documents are unclear, missing something or in conflict.
Schedule of rates
A list of unit prices for types of work, usually with no quantities and no total, used where the amount of work is not known in advance.
Scope of work
What a price or a contract covers: which trades, which parts of the building and which items.
Specification
The written document that describes the materials, products and standards the drawings do not show.
Subcontractor
A business engaged by the builder to do one trade or part of the job. Often called a subbie.
Supplier rate
The price your supplier charges you for a material, which an estimate can use in place of a market rate.
Supply and install
A rate that covers both the material and the labour to fix it, as against supply only, which is the material alone.
Take-off
Measuring and counting every item on the plans to get the quantities a job needs. It is the first step of any estimate.
Tender
A formal offer to do a job for a price, made in answer to an invitation from a client, usually in competition with other builders.
Tender register
Tender registers are lists that help you track returnables and missing documents for tender scopes.
Trade
A section of the work done by one kind of tradesperson, like concrete, carpentry or electrical. We price 19 trades, from preliminaries to fire proofing.
Unit
What an item is measured in: square metres, lineal metres, cubic metres, tonnes or a count of items.
Variation
A change to the work after the contract is signed, which can change the price and the time. How variations are priced and approved depends on your contract, so check your contract.
Waste allowance
Extra material added to a measured quantity to cover offcuts, breakage and laps, since the net quantity off the plans is never all you buy.

Want more than a definition? Read what a quantity take-off is, what is in a priced bill of quantities, provisional sums and prime cost items, preliminaries explained and RFIs and exclusions in a tender. Find more answers in our guides.

Get a price for your job