Quantity take-off service for builders
A quantity take-off is every item on your plans, measured and counted in its own unit. We do the take-off for every trade on your plans and send it back priced in an Excel BOQ, with marked-up PDF plans that show where each quantity came from.
What a take-off measures
Each item is measured in the unit it is bought and built in. The BOQ lists the quantity beside its unit, so you can check any line against the plans.
- Slabs, walls, ceilings, roofing, tiling and paint
- m²
- Concrete, excavation and fill
- m³
- Footings, skirtings, gutters, pipes and cable runs
- m
- Doors, windows, fixtures and fittings
- No.
The marked-up plans are the proof
Marked-up plans. Follow each measured quantity back to the drawing. Every quantity in the BOQ is coloured on the plans it came from, so a number you doubt is one you can check. Wrong quantity? We fix it free.
What you send
Your plans, the job location and the date you need it back. Have your own supplier or subcontractor rates? Send those too. Pick one trade, a few, or the whole job.
What you get back
- Priced bill of quantities. Quantities, rates and totals in an editable Excel workbook.
- Marked-up plans. Follow each measured quantity back to the drawing.
What it costs
One fixed fee, agreed before we start. Our take-off comes priced: every fee below includes rates as well as quantities. All fees are ex GST.
| Job | Fee, ex GST | What you get back |
|---|---|---|
| Granny flat, renovation, extension or shed | $200 to $400 | All 19 trades measured and priced. Excel BOQ and marked-up plans, back in about 2 working days. |
| 20 senior health units, NSW Health | $1,100 | Every trade across all 20 units. Excel BOQ, marked-up plans and the RFI list. |
| Cleaning estimate, Sydney Metro station | $700 / station | One station per fee. Quantities and rates in Excel for that station. |
One trade, measured on real jobs
13 tenders for $3,025
Rusty's Painting
A Gold Coast painting contractor had 13 tenders priced in four months, $233 each on average.
Questions about the take-off
- Where does AI fit in?
- AI assists with takeoffs and reading drawings. Experienced estimators set rates and review the scope; Australian engineers check the estimate. People remain responsible for the finished work.
- What if the drawings change?
- Send the addendum through. The team reprices the changes and reissues the files at no extra cost. If the overall scope changes, any fee change is agreed before proceeding.
- Can you price just one trade?
- Yes. Choose a single trade, selected trades or the whole project in the scope builder. Your estimator confirms the final inclusions with you.
- What will the files open in?
- Your priced bill of quantities and registers are Excel files; marked-up drawings are PDFs. You can review the detail in your existing spreadsheet and PDF workflow.